Oak Park Sports and Aquatic Centre
Commissioned by the Moreland City Council, the $23 million Oak Park Sports and Aquatic Centre project replaced an end-of-life swimming pool with a modern facility designed to reflect contemporary recreation trends. Completed over a 71-week build period in 2018, the updated community hub featured a 50m eight-lane outdoor pool alongside an interactive waterplay area with two fast water slides.
Working alongside architect Haskell and services engineer Irwinconsult, ProQuatics delivered the specialised aquatic infrastructure required to ensure the site could be safely and reliably utilised by the community for generations to come.

SCOPE
ProQuatics was responsible for the full delivery of the filtration, hydraulics and water features package for the redeveloped facility. The technical scope encompassed the supply, installation and commissioning of advanced commercial pool filtration systems engineered to manage the heavy bather loads of a high-use public outdoor environment.
ProQuatics also delivered the complete pool heating plant to ensure consistent thermal regulation across the pools. Additionally, the team implemented integrated hydraulic services and water circulation systems required to power the facility’s interactive water features and dual water slides while maintaining strict water clarity and hygiene standards.