Mordi Aquatic Centre
Delivered in partnership with head contractor ADCO for the City of Kingston, the new $87 million Mordi Aquatic Centre is a transformative greenfield development occupying a former industrial site in Mordialloc. Initiated to replace a local facility that reached its end of life, this landmark precinct is the largest infrastructure project ever undertaken by the council. The modern complex is designed to enhance community health and connection, integrating a comprehensive gym, fitness areas, wellness spaces and a vibrant café hub. ProQuatics is delivering the specialised aquatic package for the centre, which features four primary public pools alongside dedicated waterplay amenities.
ProQuatics is managing the full supply, installation and commissioning of the aquatic infrastructure across the site’s extensive water zones, which include a 50m multi-purpose lap pool, a learn-to-swim pool, a hydrotherapy pool, a spa pool and a leisure pool. To guarantee premium water clarity and hygiene, the team is deploying an advanced Ultra Fine Filtration system servicing all pools and interactive water features. The technical scope also includes the design and implementation of a remote chlorine fill station required to safely navigate the specific environmental requirements of the greenfield site. Additionally, ProQuatics is constructing the facility’s diverse waterplay experiences, dividing the systems between a zero-depth splash area and a shallow-depth play pool.
