Methodist Ladies College – Physical Education and Sport Precinct

  • Methodist Ladies’ College
  • Melbourne, Victoria
  • Schools

ProQuatics successfully completed the pool filtration and hydraulics packages for a major aquatic development featuring a 50m pool alongside dedicated learn-to-swim pools, delivered in partnership with construction partner Kapitol Group. Designed with environmental performance and spatial efficiency in mind, the site features a fully electric central heating plant and specialised below-ground lane rope storage to maximise deck access for patrons and staff.

Operating closely with the project’s design team and client, ProQuatics overcame complex site logistical constraints to engineer a practical, fit-for-purpose water treatment plant that supports high bather loads while maintaining optimal operational access.

SCOPE

ProQuatics was responsible for the complete supply, installation and integration of the filtration, hydraulic and chemical management infrastructure across the 50m and learn-to-swim pools. To achieve superior water clarity and energy savings, the technical scope deployed high-efficiency Neptune Benson ultra-fine eco-filters paired with an automated ProMinent chemical management system.

Addressing a significant site challenge regarding limited access for bulk sodium hypochlorite deliveries, ProQuatics collaborated with stakeholders to re-engineer the sanitisation system to utilise granular calcium hypochlorite. Supplied in compact, manageable containers, this tailored solution eliminated the need for large delivery vehicles while guaranteeing reliable, compliant water treatment across all bodies of water.

Related Projects