Keilor East Leisure Centre

  • Moonee Valley City Council
  • Keilor East, Victoria
  • Aquatic Centres

Commissioned by the Moonee Valley City Council, the $44 million East Keilor Leisure Centre Redevelopment revitalised a 50-year-old sports and leisure centre with modern, state-of-the-art facilities. Completed over a 13-month period ending in August 2021, the upgraded facility featured a 50m heated outdoor pool, a 25m indoor lap pool, a dedicated learn-to-swim pool, an indoor water playground, a spa pool, a steam room and a sauna.

ProQuatics delivered the complete aquatic package for this key community asset, collaborating successfully on a site that utilised early-stage value engineering, buildability advice and strategic methodology to ensure project success.

SCOPE

ProQuatics was responsible for the full installation and delivery of the aquatic infrastructure, which utilised advanced Myrtha pool technology featuring a pre-engineered modular system of factory-laminated, stainless-steel PVC panels and an engineered buttress system. The scope encompassed the complete integration of all filtration, hydraulics and water features across the facility’s multiple indoor and outdoor zones.

The team deployed fully integrated hydraulic and commercial filtration systems specifically engineered to support the demanding circulation and water hygiene requirements of high-use public environments. These systems ensured consistent water clarity across the lap pools, learn-to-swim zones, spa and interactive children’s water playground.

Related Projects

ProQuatics Under Construction
Torquay, Victoria

Wurdi Baierr Aquatic and Recreation Centre

  • Aquatic Centres
ProQuatics Under Construction
Mordialloc, Victoria

Mordi Aquatic Centre

  • Aquatic Centres