Fawkner Leisure Centre Redevelopment
The Fawkner Leisure Centre Redevelopment transformed an ageing community asset into a vibrant, accessible and fully electric facility that aligned with Merri-bek City Council’s zero carbon objectives. Reopened in December 2024, the modernised centre featured a refurbished indoor 25m pool, a new outdoor 50m pool, a leisure pool with water features, a new outdoor family water play pool and a new indoor sauna, steam room and spa.
ProQuatics successfully navigated the complexities inherent in redeveloping an existing site, which included adapting to changing ground conditions and working around established structural footings.

SCOPE
ProQuatics delivered the complete aquatic package for the redevelopment, which encompassed the integration of all filtration, hydraulics and water features across the site’s various zones. The scope included the refurbishment of the existing indoor 25m pool alongside the installation of new infrastructure for the outdoor 50m lap pool, the leisure pool and the replacement spa pool.
The team implemented fully integrated hydraulic and commercial filtration systems engineered to support high-use public swimming environments. These systems ensured consistent water clarity and hygiene while supporting the fully electric, low-carbon operational requirements of the updated facility.



