Collingwood Football Club
Delivered in partnership with head contractor Schiavello Construction, ProQuatics successfully completed the high-performance aquatic recovery and training facility for the Collingwood Football Club at their elite Melbourne headquarters. The highly technical project was uniquely bespoke, requiring the new pools to be constructed flawlessly within the existing structural setdowns of the historic 1956 Olympic pool building.
Designed to meet precise elite athletic parameters, the state-of-the-art hydrotherapy facility integrates with the club’s existing 25-metre lap pool to create a world-class recovery precinct that drives the daily physical conditioning of the club’s AFL athletes.

SCOPE
ProQuatics was responsible for the full design, structural delivery and engineering of the advanced hydrotherapy facility. The new heated therapy pool (8.5m x 5.5m) and chilled recovery pool (6m x 3.5m) were constructed utilising advanced Myrtha Pools technology, providing a pre-engineered modular solution with deep submersion zones and a 20-year system guarantee. The technical scope encompassed building a custom dual thermal management plant, integrating external heat exchangers and a chiller-configured heat pump network to maintain precise contrast-therapy temperatures.
For the plant room, ProQuatics engineered a high-load filtration system utilising a mixture of pressure sand and cartridge filtration, augmented with secondary UV sanitisation to ensure maximum water hygiene under peak athlete loads. The scope was completed with the installation of elite hydrotherapy features, including targeted spa jets, deluge features and custom ergonomic athlete benches.